STRUCTURE
RCC Framed Structure With Foundation Designed To Withstand Seismic Loads As Per Structural Design Conforming To BIS.
Walls Using Solid Blocks In Cement Mortar With Adequate Reinforcement At Required Levels.
Ceiling Height Will Be Maintained At 9'6 Clear From Finished Floor Level.
Wall Finishing
Internal Walls Will Be Finished With Smooth Finished Cement Plaster, Wall Care Putty Coats And Premium Emulsion Paint.
Exterior Walls Will Be Finished With Neat Cement Plaster, White Cement Coat And Weather Proof Exterior Emulsion Paint.
Toilet Walls Will Be Finished With Designer Glazed Ceramic Tiles Of Colour And Size Till False Ceiling Level As Per Architect's Concept. Trims, Dadoing And Profiles In PVC Will Be Used To Protect The Edges Of The Ceramic Tiles.
Kitchen Platform Walls Will Be Finished With Ceramic Tiles Of Colour And Size Up To 2'0" Above The Cooking Platform.
Ceiling Surfaces Will Be Finished With Neat Cement Plaster, White Cement Coat And Asian Ace.
Flooring
Living, Dining, Kitchen And Bed Room Areas Will Be Finished With 24" X 24" Vitrified Tiles With 4" High Skirting As Per Architect's Concepts.
Utility, Toilet Areas And Balconies Will Be Finished With Acid Proof Anti Skid Ceramic Tiles As Per Architect's Concept.
Common Areas And Lift Lobby Will Be Finished With Scratch Proof Porcelano / Ceramic Tiles.
Car Parking Will Be Finished With Graeno Flooring And Staircase Shall Be Finished With Granite As Per Architect's Design.
Terrace Areas Will Be Finished With Proper Weathering Course Finished With Clay Tiles.
Joineries
Entrance Main Door Will Be Provided With Seasoned Teak Wood Frames And 38 Mm Thick Teak Wood Moulded Panel Flush Shutter, Stainless Steel Fittings, Mortise Locks, Door Eye View.
All Bedrooms, Toilets And Balcony Doors Will Be Provided With Seasoned Country Wood Frames And Water Proof Hardcore Flush/Panel Doors With Required Fittings As Per Architect's Design.
Modular Two Or Three Panel Sliding UPVC Window Frames And Shutters With Safety MS Grills Will Be Provided.
All Bedroom Balconies Will Be Provided With French Doors Of Seasoned Teak Wood Frames And Shutters Along With Safety MS Grills.
Kitchen
Counter Top Granite Platform Will Be Finished With 16mm Thick Granite Slab 2'0" Wide At A Height 2'6" From The Finished Floor Level Along With Stainless Steel Single Bowl Sink With Drain Boards And CP Long Body Tap.
Provision For Exhaust Fan, Mixer, Grinder, Microwave And Refrigerator Will Be Provided.
Loft Will Be Provided As Per Architect's Design On One Side.
Plumbing And Sanitary
All Sanitary Wares Will Be New Range EWC White Colour With Flush Tanks As Per Architect's Design And Concepts.
All CP Fittings And Taps (like Single Lever Diverter, Spout, Shower, Health Faucet Etc.) Will Be Provided As Per Architect's Design.
All Bathrooms Will Have Provision For An Exhaust Fan And Geyser Connection.
Each Apartment Be Provided With A Water Meter.
Electrical And Power Back Up
3 Phase Underground Cable From The Onsite Transformer Power Supply And Concealed Insulated Multistrand Copper Wires Will Be Provided In All Apartments With Individual Distribution Box Having MLCB, MCB's And Automatic Phase Selector.
Automatic Standby Generator Backup With Acoustic Panel For Common Area And All Apartments.
All Switches And Sockets Will Be Provided In Metal Box And Modular Switches With Cover Plates.
All Apartments Shall Be Provided With An Automatic Current Controlling Limiter (ACCL) Device In Order To Provide Power Backup For Lights, Fans And All 5 Amps Switches And Sockets Only.
1 BHK - 500 Watts | 2 BHK - 750 Watts | 2 BHK + Study / 3 BHK - 1000 Watts
Water Proofing And Anti-termite Treatment
Water Proofing Treatment Using Brush Bond Technology Will Be Performed For All Rest Rooms, Utility And Other Water Storing Bodies As Per Architect Design.
Anti-termite Treatment Will Be Performed In Six Various Stages As Per BIS For Each Building Of The Project With A Guarantee Certification Of 10 Years
Water And Sewarage
Common Underground RCC Sump Of 2 Lakh Litres Capacity With Hydro Pneumatic System For Water Supply Will Be Provided, Separated In Two, For Use To Store Metrowater / Bought Out Water And Borewater.
5 Nos. Borewells
Individual R. O. Systems
Additional Mini-sump At The Entrance For Both Water And Sewer, So That Future Connectivity Is No Hassle.
Sewerage Treatment Plant (STP) Of 120 KLD Capacity And Common Underground Tank Provision With Manholes, Of Adequate Capacity Shall Be Provided With Provision For Recycling The Treated Water, For Flushing & Gardening Use.
Others
1 Nos. 6 Passenger Elevators For North Wing And 4 Nos. 10 Passenger Elevators For All Other Wings Put Together, Will Be Provided With A Variable Voltage Variable Frequency (V3F) And Automatic Rescue Device (ARD) Technology Along With 100% Genset Power Back Up.
Access Controlled Entry Into Courtyard And Each Block Core.
One Swing Hook Per Apartment, As Per Customers Choice Shall Be Provided
All Bedrooms Will Be Provided With A Loft As Per Architect's Design On One Side.
Reticulated Piped Gas
Rain Water Harvesting
Dedicated Garbage Disposal Area