Foundation
Open Raft Foundation With R.C.C Beams And Slab.
STRUCTURE
RCC Framed Structure From The Basement Floor Up To Terrace Floor Designed For Seismic Condition ( Earth Quake Resistant). The Infill Walls Finished With Fly Ash Bricks/ Brick Work /Concrete Block Masonry Plastered On Both Sides.
Doors & Windows
Pre Hung Factory Made Doors Frames And Solid Core Door Shutters With Stainless Steel Accessories. Windows And French Doors Are Finished With UPVC Polymer Openable / Sliding Fixed Single Glazed Window Shutters With 4mm To 5mm Clear Glass With EPDM Gasket For Water Tightness And Quality Hardware Fixtures. UPVC Top Hung Ventilators With 4mm Glass.
Floor Finish
Living, Dining, Passages, And All Bed Rooms Finished With 2’0 X 2’0 Vitrified Tiles Flooring. 12” X 12” Ceramic Tiles For Toilets, Kitchen And Service And Balconies.
Wall Tiles
8” X 12” Ceramic Tiles For Toilets, Above Kitchen Counters And Services Area
Kitchen
2’0” Pre Polished Granite Counter Will Be Provided. Kitchen Sink RO Will Be Provided. Reticulated Gas Supply From The Common Gas Bank Maintained By The Govt. Approved Gas Companies.
Electrical
Three Phase Electrical Main Supply With ISI Copper Wiring And Modular Range Of Electrial Switches: Generator Backup Power Supply To All Common Area Such As Lifts, Pumps, Common Area Lighting, Yard Lighting, And Up To 500 Watts Lighting Load In Each Apartment.
Plumbing & Sanitary Fittings
Water Lines Are Connected And Distributed By CPVC Water Pipes And The Waste Water, Soil Lines Are Conveyed Through PVC Pipes. Parryware / Hindware / Equivalent Range Of Washroom And Sanitary Fittings.
Painting
Interior Walls, Ceiling Are Finished With Synthetic Emulsion Paint, Common Area Finished With Textured Paint/synthetic Emulsion Paint, The Exterior Is Painted With Weather Shiel Paint. The Car Parking Is Painted With Cement Paint.
Lift
4 No. Auto Door 8 Passenger Lift And 2 No. 13 Persons Compatible To Bed Lift During Emergency Shall Be Provided With Automatic Door. The Lift Will Service From Basement Floor + Stilt + All Upper Floors.
Water Supply & Drainage :
Adequate Tube Well’s Will Be Provided And Pumped To Under Ground Sump Tank With A Capacity Of About 2,25,000 Ltrs Gravity / Pneumatic Flow Water Supply Shall Be Provided. The External Soil Lines And Waste Water Lines Are Connected By PVC Pipes To Gully Chambers And To Inspection Chambers. The Inspection Chamber Are Inter Linked With PVC Pipes To The Main Head Manhole Chamber To The Sewerage Treatment Plant.
Fire Fighting System
Automatic Wet Riser With Yard Hydrant System. The Car Parking Area And All Apartment Shall Be Protected With Sprinklers System. Exclusive Underground Storage Tank With Sprinklers System. Exclusive Underground Storage Tank With A Capacity Of About 75,000 Ltrs For Fighting System Will Be Provided. Smoke Sensors And Public Address System In The Common Areas.
Sewerage Treatment Plant
The STP Is Located In Below The Ground Level And Shall Be Collected, Processed, Aerated, And Treated Water Shall Be Used For Gardening And Flushing Toilets Purpose.