STRUCTURE
o R.C.C Framed Structure: R.C.C Framed Structure.
o Superstructure: 8” Thick AAC & CC Blocks For External Wall & 4” Thick AAC & CC Blocks For Internal Walls.
PLASTERING & POP PUNNING
o Internal: POP Punning
o External: 2 Coats Of Plastering For Walls.
PAINTINGS
o External Walls – Textured / Smooth Finish With Two Coats Of Exterior Emulsion Paint Of Reputed Make.
o Internal Walls – Smooth Putty Finish With Two Coats Of Acrylic Emulsion Paint Of Reputed Make Over A Coat Of Primer.
DOORS
o Main Door: Engineered Wooden Door Frame And Shutters.
o Internal Doors: Engineered Wooden Frames With Flushed Shutters.
o French Doors (if Any): UPVC Door Frames With Tinted Glass Shutters
WINDOWS
o UPVC Window System With Tinted Glass As Per Design.
FLOORING
o Living, Dining, Bedrooms & Kitchen: Vitrified Tiles Of Reputed Brand.
o Toilets: Anti-skid Ceramic Tiles Of Reputed Brand.
KITCHEN
o Granite Platform With Stainless Steel Sink
o Provision Of Points For Fixing Of Water Purifier, Exhaust Fan & Chimney.
UTILITIES / WASH
o Provision Of Points For Dish Washer And Washing Machine.
BATHROOMS
o Washbasin With Pillar Cock.
o EWC With Flush Tank.
o Single Lever Fixtures With Wall Mixer Cum Shower.
o Provision For Geysers In All Bathrooms.
o All C.P. Fittings Are Chrome Plated.
DADOOING
o In Kitchen: Glazed Ceramic Tiles Dado Of Reputed Make Up To 2'-0" Height Above Kitchen Platform.
o Bathroom: Glazed Ceramic Tile Dado Of Reputed Make Up To 7′-4″in Wet Area & Up To 4’5” In Dry Area.
o Utility: Tiles Dado Of Reputed Make Up To 3 Height
ELECTRICAL
o Concealed Copper Wiring.
o Power Point For Air Conditioners In All Rooms.
o Power Point For Cooking Range Chimney, Refrigerator, Microwave Oven, Grinders In Kitchen.
o Miniature Circuit Breakers (MCB) For Each Room In Distribution Board.
o Three Phase Supply For Each Unit And Individual Meter Boards.
TELECOM / INTERNET / CABLE TV
o FTH To Internet, DTH, Telephone & Intercom.
LIFTS
o 4 High-speed Automatic Passenger Lifts (10 Passengers’ Capacity) With Rescue Device And V3F For Energy Efficiency.
o One Service Lift (15 Passengers’ Capacity) With V3F For Energy Efficiency.
WTP & STP
o In Case Of Bore Well Water, Water Would Be Fully Treated Water Made Available Through Exclusive Water Softening And Purification Plant.
o A Sewage Treatment Plant Of Adequate Capacity As Per Norms Will Be Provided Inside The Project. Treated Sewage Water Will Be Used For The Landscaping And Flushing Purpose.
GENERATOR
o D.G Set Backup With Acoustic Enclosure & A.M.F
FACILITIES FOR PHYSICALLY CHALLENGED
o Access Ramps At All Entrances Shall Be Provided For Physically Challenged.
SECURITY
o Surveillance Cameras At The Main Security And Entrance.
PARKING
o Parking Will Be Provided In Two Levels I.e, Basement 1 & 2.
o Entire Parking Is Well Designed To Suit The Number Of Car Parks, Provision Of Parking Signage’s At Required Places For Ease Of Driving.
FIRE & SAFETY
o Fire Hydrant And Fire Sprinkler System In Basements.
o Fire Hydrant In All Floors.
Fire Alarm And Public Address System In All Floors And Basements.
LPG
Supply Of Gas From Centralized Gas Bank To All Individual Flats With Pre-paid Gas Meters.